Larsen & Toubro has won a significant transportation infrastructure order to build a 3.2-km cable-stayed bridge over the Muri ...
The Transportation Infrastructure business vertical of Larsen & Toubro (L&T) has won a significant order for an arterial Cable-Stayed Bridge over the Muri Ganga River in South 24 Parganas district of ...
L&T will build a 3.2-km 2+2 lane cable-stayed bridge with 177 m span, including 0.9 km and 0.65 km approach roads on Kakdwip ...
Mumbai: L&T has clinched a major contract that’s set to bridge the connectivity gap—literally—in eastern India. The ...
Pictures of the new ‘world’s longest’ bridge have been released, with the structure costing a staggering NT$12.49 billion ...
The Mahalaxmi cable-stayed bridge, along with another bridge, is set to be completed by October 2026. This new cable-stayed bridge will replace the century-old Mahalaxmi bridge. The Brihanmumbai ...
The Camalaniugan Bridge is about 574 km north of the capital Manila. It was initially due to open by end-2024.
In addition to being the tallest, the bridge is also the longest three-tower, cable-stayed bridge in the world, spanning 1.7 ...